2. Perform the operations described in sections 2 to 4 of Section Diesel engine M67.
3. Remove the bolt (1), give the union nuts (2), remove the distribution tube (3).
4. Give union nuts (1), remove the distribution tube (2) and disconnect the fuel return pipes (3). Give the cap nuts (4), remove the distribution tube (5) and fuel distributor (6).
5. Give the union nut (1) and unscrew the distribution pipe (2) in the direction indicated by the arrow.
6. Cut the clamp (1) and remove the holder (2) hose.
7. Loosen clamps (1) and remove the hoses (2).
Clamps and hoses.
8. Release a water hose from a clamp and disconnect it from a tube of system of cooling.
9. Turn out bolts (1) and pick up the phone (2) EGR systems. Clean tube mating surfaces and replace EGR tube gaskets.
EGR tube.
10. Turn out bolts.
11. Slightly lift the handset (1) cooling system and pull it out of the case (2) thermostat.
If necessary, replace the O-ring in the thermostat housing.
12. Slightly lift the tourniquet (1) electrical wiring ki and pick up the handset (2) cooling systems.
13. Give fixture on perimeter to an oil separator flange.
14. Remove the cable harness holder from the grub screw.
15. Open the water hose lock (1), disconnect it and remove the oil separator (2) PCV systems.
16. Installation is carried out in the reverse order. Use new gaskets, install them dry on pre-cleaned mating surfaces.